From pre-design through to post-construction, Seladi-85 manages the full project lifecycle.
Design aligned to PNG conditions, regulation, and build realities.
Architects, engineers, QS, and contractors coordinated throughout.
Commitment to timelines, budgets, and client outcomes.
Post-completion verification and compliance
Independent project review, risk assessment, and recovery advisory
Defined recovery pathways, quantified financial exposure, and provided Board-level decision options.
Every stage is documented. No ambiguity on what is included, what is excluded, or who is responsible.
All consultants, contractors, and approvals are managed under one accountable firm.
Budget and programme are set early and tracked throughout. No surprises at construction stage.
One team. One contract. One firm responsible from concept to completion.
We define project scope, space requirements, and feasibility.
Site analysis, budgeting, and coordination with consultants ensure a clear starting point.
We translate concepts into clear design direction.
Layouts, massing, and initial systems are developed for client approval and cost alignment.
We refine the approved scheme to a construction-ready level.
Materials, finishes, and building systems are coordinated and confirmed with the client.
We produce the full drawing and specification package required to build.
All documentation is certified by a Registered Architect and issued for tender and approvals.
Additional stages: Statutory Approvals, Project Tendering, Procurement, Contract Administration, Post-Construction Assessment, As-Built and Building Audits.
Result: a build-ready, cost-aligned, and fully coordinated project.
A high-specification commercial interior delivered on time and to brief. Coordinated design, procurement, and fitout under single accountability
DESIGN
For clients with an in-house PM or existing contractor relationships.
Includes:
For clients tendering construction. Full package ready for contractor bids.
Includes:
We stay accountable from first sketch to practical completion.
Includes:
Cost Control Across the Lifecycle
Costs tracked from design concept through to practical completion. Variations controlled before they become overruns.
Supplier Selection Aligned to Budget
Materials and contractors sourced against your cost plan and timeline. No surprises at procurement stage.
Reduced Delays Through Coordinated Logistics
Supply chain managed proactively. Material lead times and site delivery tracked and resolved before they delay programme.
Quality Assured Before Installation
All materials and contractor work checked against specification before installation. Defects captured early, not at handover.
Without Seladi-85
With Seladi-85
Approvals delays from incomplete documentation
Regulatory submissions prepared and managed by our team
Cost overruns from unmanaged contractor relationships
Single contract. Known scope. Controlled variations
Quality defects from lack of on-site architectural oversight
Site reviewed through design parameters and practical completion
Registered Architect, Papua New Guinea
Member, PNG Institute of Architects
Registered architectural practice since 2015.
Registered with Internal Revenue Commission (IRC), Papua New Guinea
Or call us directly:
+675 320 0180